So at this point we have all the lighting in. What's left--LR, DR, Hallway flooring,...runner on stairs,...tile around tub,...cabinetry,...kitchen(!),...bathroom and plumbing fixtures,...trim, etc...and 30 days or less! Hopefully the yard gets seeded although the weather has turned cold these past few days. If not, they will do so in the spring with the macadam driveway.
Subscribe to:
Post Comments (Atom)
1 comment:
YAY!! Lighting fixtures!! Love the view from the top of the staircase!
Post a Comment