Wow, these guys (hanging the drywall) are the messiest around. It is a war zone walking through the house. Drink containers, etc litter the place. Mr. Musser (builder, in name only) has a sign on the door stating that they need to clean up after themselves or else they will be fined. Hopefully he does not do an inspection in the near future. The other contractors were very orderly and clean. These guys are not! Nonetheless, clipping right along. It is amazing to see what a butcher job it is, thank goodness for all the detailing work. Interestingly, it took right under 2 months to do everything up to this point. It will take 2 months to do all the finishing--cabinets, flooring, trim, etc. Nice to see that an equal amount of time is spent on the stuff you spend all day looking at.